Boosting the capacity of World Trade Centre Gibraltar

Boosting the capacity of World Trade Centre Gibraltar Image: Wikipedia
Location:
Gibraltar
Project type:
Sales
Sector:
Construction & Building services

When World Trade Centre (WTC) Gibraltar needed to increase its standby power generation capacity due to a change in use of part of the complex, we were on site to support the project.

WTC Gibraltar was constructed to represent the pinnacle of international trade and business; it is part of a family of over 323 WTCs in 88 countries around the world. As a high-profile complex, it is home to some of the most recognised global multinationals.

As part of this install, we integrated 2 x HIMOINSA HDW-750 (750kVA) standby generators with the building’s existing standby power plant.

Due to the lack of space on site, we installed the generators by skating them into position via the underground car park, through the rear of the building’s structure. Due to the complexity of the install, our engineers were responsible for the full commissioning and control philosophy.

All noise attenuation, air flow and exhaust flue works were also completed by our engineers during the install.

Download as a PDF See more case studies
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335

Have an emergency?
We provide 24/7 Power Solutions,
call us now on:
0845 600 3335

or have a planned outage?
We can help with that too
Generator Hire