Emergency support for a major shopping destination in the lead-up to Christmas

Emergency support for a major shopping destination in the lead-up to Christmas Image: Unsplash
Location:
Herefordshire, UK
Project type:
Product Hire
Sector:
Construction & Building services

In the run-up to Christmas, we received an emergency enquiry to support a major retail village which had experienced a power outage during its busiest week of the year.

We immediately mobilised 3 x 150kVA and 1 x 100kVA generators along with bulk fuel tanks and cabling, and delivered our equipment to site within 4 hours of the initial call out.

Our engineering team installed and tested the power throughout the night, ensuring the shopping village was able to reopen as normal in the morning.

Download as a PDF See more case studies
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335

Have an emergency?
We provide 24/7 Power Solutions,
call us now on:
0845 600 3335

or have a planned outage?
We can help with that too
Generator Hire