Meeting noise restrictions at an on-site data centre

Meeting noise restrictions at an on-site data centre Image: Unsplash
Location:
Birmingham, UK
Project type:
Product Hire
Sector:
Data Centres

Compliance to noise restrictions proved a challenge when an on-site data centre in Birmingham required a temporary generator during major emergency repair works to its own unit.

Due to the city-centre location, the site was particularly noise sensitive and the generator needed to comply with strict noise regulations.

A 150kVA SilentPlus HIMOINSA model in a silent canopy fitted the bill perfectly, due to its very low noise output of less than 65dBA at 7m.

Download as a PDF See more case studies
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335
24 / 7 emergency response
|
0845 600 3335

Have an emergency?
We provide 24/7 Power Solutions,
call us now on:
0845 600 3335

or have a planned outage?
We can help with that too
Generator Hire