Powering a major COVID-19 test centre
Location:
Manchester, UK Project type:
Product Hire Sector:
Government We were contacted to provide temporary power generation for a major drive-through Covid-19 testing clinic in Manchester.
In order to ensure the power was set up for mass testing to commence, we rapidly supplied a 35kVA generator along with a 1000L fuel tank to the site.
Our engineering team provided full installation, and we supported the site with fuel management during the project. The generator remained on site for the duration of the pandemic.